Sunday, September 23, 2007

Getting ready for the builders

Jesse taking every chance he gets to do small botanical surveys around the property
Connecting all the pipe works
The man behind all the pipes (and Jesse)Jesse is getting good on the excavator (I have to watch it so he doesn't surpass me)

The water poly pipes lays in the same trench as the conduit separated by gravel
The conduit ready to be buried underneath good gravel
OK, me trying to be creative with the camera
A lot of conduit leading out from the battery room

Thank God for the excavator!
The last shed arrives
Cutting holes in the water tank for the fittings
Digging down the "Ag pipe" from the dam
Water intake from the dam
Surprisingly amount of meat from a small rabbit
The proud hunter

No comments: